Go to EntraPASS
Award Winning Access Control
Turnstile Installation Home Page

A dIVISION OF


GSA - GS-07F-9239S

Insulated Fiberglass Portable Security Buildings

# 32 Denver Rescue Mission # 32
 
Turnstile Cage Assemblies
Installation Process

Engineering / Drafting: Carter J. Carter

Design Engineer: Patrick J McAllister

Procurement: Wanita Savage-Nash

Contract Administration: Ellen Keyes

Information Technology / Programming: Adriana Lorenzi

The Denver Rescue Mission contacted us to provide and install our HS 439 Turnstile

This project will take Two (2) Men - One (1) Day

Field Installation Crew
Jesse James Moses Sr.
Jesse James Moses Jr.

Jesse Sr. has been installing TURNSTILES and SOUNDMASKING with us since the mid 1980's
our first project was installing the Interim Sound System at Mile High Stadium (home of the Denver Broncos)

Jesse James Moses Jr. has been with us for 7 years (approx); his work ethic is home grown !! That Boy (Man) works HARD!!

Also, the Moses Family was recognized by the State of Colorado for their work in the Foster Care System


Meet the Moses's

Go to EntraPASS
Award Winning Access Control



GSA - GS-07F-9239S

PATRICK.MCALLISTER@TURNSTILES.US

303 670 1099

Turnstile Installation Home Page

Insulated Fiberglass Portable Security Buildings